Façades & Cladding

Exterior finish, substructure and installation sequence meet at the façade.

Finished commercial façade with vertical glazing strips.
Finished commercial façadeVK Buildtech work / application

Decision context / 01

Start with the conditions around the system.

An exterior system needs coordinated material selection, substructure, joints and on-site execution. The right detail depends on the building and exposure.

  • ACP01
  • HPL02
  • WPC03
  • Commercial frontage04
  • Retrofit05
  • Site coordination06

Detail / 02

Material and finish

ACP, HPL and WPC have different composition, finishes and system requirements. Compare approved product documentation against exposure, substrate and maintenance needs.

Commercial façade/elevation.
Material and finishApplication / VK Buildtech work

Detail / 03

Substructure and interfaces

Set-out, support, cavity or backing, joints and transitions need coordination with the existing or proposed building. The detail depends on the selected system.

Cladding/substructure progress on scaffold.
Substructure and interfacesApplication / VK Buildtech work

Detail / 04

Site execution

Survey, access, sequencing and adjacent trades affect the final result. Confirm interface details before materials reach site.

Façade installation in progress with scaffold.
Site executionDetail / execution photograph

Applications / 04

Considered for commercial buildings, residential exteriors.

Final system choice follows the site survey, drawings and project-specific requirements.

Systems / ACP / HPL / WPC

Next / Start a project

Discuss a system for your site.

Tell us about the opening, façade or building system you are planning.